1. Home
  2. Question and Answer
  3. Houseplants
  4. Garden Articles
  5. Most Popular Plants
  6. Plant Nutrition

Fixing a Hardie Rain Dial RD600 That Runs 7 Days a Week Instead of 3

Clearing Old Programs from a Legacy Sprinkler Controller

When a newly programmed Hardie Rain Dial RD600 runs every day at 7 AM and 7 PM instead of just Mon/Wed/Fri 7–8 AM, the controller almost certainly has residual programming from a previous schedule that wasn't fully cleared.

Why This Happens

  • Many controllers retain multiple programs (A, B, C) simultaneously
  • If Program B or C has old start times, they'll run alongside your new Program A
  • Factory defaults or previous owner's settings often persist

Step-by-Step Fix Using the Manual

  1. Download the official RD600 manual (PDF)
  2. Follow the "Clear All Programs" or "Reset to Factory Defaults" procedure
  3. Re-program only Program A with your desired schedule
  4. Verify Programs B and C are completely empty (all start times OFF, all run times 0)

Key Programming Tips

  • Set one start time per program (e.g., 7:00 AM)
  • Assign run times to individual stations, not the program
  • Set watering days for each program (Mon/Wed/Fri for Program A)
  • Ensure Seasonal Adjust is at 100% unless intentionally reduced

If the controller still malfunctions after a full reset, the memory circuitry may be failing—consider upgrading to a modern controller.

Copyright © www.100flowers.win Botanic Garden All Rights Reserved