1. Home
  2. Question and Answer
  3. Houseplants
  4. Garden Articles
  5. Most Popular Plants
  6. Plant Nutrition

Purging Irrigation System: Manual Valve Operation Guide

Photo shows valves with levers and bleed screws. Need instructions for manual open/close for winterizing.

Lever Operation

The lever is a quarter-turn ball valve:

  • ON: Lever parallel to pipe (90° turn from OFF)
  • OFF: Lever perpendicular to pipe

Bleed Screw Operation

The plastic bleed screw on top of the valve:

  • Open: Turn counterclockwise slightly (¼-½ turn) - valve opens
  • Close: Turn clockwise snug (don't overtighten - plastic strips easily)
  • Warning: Don't unscrew completely - it can eject under pressure

Winterizing Procedure

  1. Shut off main water supply
  2. Connect air compressor to system (at main or blow-out port)
  3. Manually open one zone at a time (lever or bleed screw)
  4. Blow out until only air comes from heads
  5. Close zone, build pressure, repeat for all zones
  6. Leave all valves ~½ open (bleed screw loose) for winter

Copyright © www.100flowers.win Botanic Garden All Rights Reserved