1. Home
  2. Question and Answer
  3. Houseplants
  4. Garden Articles
  5. Most Popular Plants
  6. Plant Nutrition

Why Sod Must Be Laid Within 24 Hours of Delivery

Sod left on pallets for two days suffered 80% loss because trapped heat from microbial activity "cooks" the grass — similar to compost pile heating. Internal temperatures rise within hours of harvest.

Best Practices

  • Install sod within 24 hours of delivery.
  • If delayed, unroll pieces on driveway, keep moist.
  • Plan labor: 3 hours per pallet (500 sq ft) per person.
  • Provide plenty of water for workers.

High-Value Exception

For premium turf (golf greens, stadiums), refrigerated trucks prevent heating. Homeowners lack this option, so timely installation is critical.

Copyright © www.100flowers.win Botanic Garden All Rights Reserved