Builders often scrape lots bare—removing mature trees, topsoil, and natural drainage—then charge you to reinstall inferior versions. A pre-construction landscape strategy saves thousands and preserves irreplaceable assets.
| Phase | Timing | Focus |
|---|---|---|
| 1. Infrastructure | During construction | Grading, drainage, irrigation sleeves, conduit, hardscape bases |
| 2. Bones | Post-certification | Trees, large shrubs, retaining walls, patios, fences |
| 3. Flesh | Year 1 | Perennials, groundcovers, lawn/seed, edging |
| 4. Polish | Year 2–3 | Lighting, furniture, art, specialty collections |
ASLA data: Professional landscaping returns 100–200% at resale. But *poor* landscaping (wrong plants, bad drainage, cookie-cutter design) *reduces* value. Invest in design first—installation follows.
Renovating a Neglected Ohio Lawn: Soil-First Approach Beats Full Replacement
Landscaping for Energy Conservation: Post-Katrina Cost Solutions
Strategic Tree Planting: Cut Energy Bills Year-Round
Ficus Trees Indoors: Selection, Care & the Sacred Fig Legacy
Landscaping: America's Favorite Outdoor Pastime
Establishing Grass on a New Construction Lot
Tree Staking Duration: One Season Maximum
First-Year Care for Catalpa and Willow Whips: To Prune or Not to Prune?
Mystery Plant in Victoria, BC: Need Photos for Identification
Removing Trunk Wrap from Newly Planted Trees: When and Why
Small Trees for Landscaping: Perfect Picks for Limited Spaces
Copyright © www.100flowers.win Botanic Garden All Rights Reserved